{"id":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Demo: badkamer Demokamp","status":"ACTIEF","projectType":"BADKAMER","adres":"Voorbeeldstraat 12, Utrecht","woningtype":"Tussenwoning","bouwjaar":1972,"gewensteStart":"2026-09-07T00:00:00.000Z","budgetMinCents":1200000,"budgetMaxCents":1800000,"zelfwerkzaamheid":"DEELS_ZELF","templateVersionId":"e26b2a42-fd21-4f05-b47f-19729f0344ae","ownerId":"140287ce-5672-4db0-bf62-212010dee8bb","paspoort":{"vve":false,"monument":false,"afmetingen":{"hoogteCm":250,"lengteCm":260,"breedteCm":220},"installaties":"CV-ketel op zolder; mechanische ventilatie aanwezig; waterleiding via keukenwand.","bereikbaarheid":"Rijtjeshuis, parkeren voor de deur, badkamer op 1e verdieping via vaste trap."},"createdAt":"2026-07-12T15:57:31.986Z","updatedAt":"2026-07-12T21:49:08.368Z","scopeItems":[{"id":"e5996ad7-faec-4da0-a4fb-435f877d8440","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Sloopwerk oude badkamer","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.sloop","templateVersion":1,"ruleId":"gen.scope.sloop","createdAt":"2026-07-12T15:57:32.058Z"},{"id":"5dd95394-27e6-43cb-98cd-3e45e8bd6ac6","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Water- en afvoerleidingen","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.leidingwerk","templateVersion":1,"ruleId":"gen.scope.leidingwerk","createdAt":"2026-07-12T15:57:32.061Z"},{"id":"c0be4524-5f84-468a-b0f6-fa7580de3212","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Elektra en verlichting","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.elektra","templateVersion":1,"ruleId":"gen.scope.elektra","createdAt":"2026-07-12T15:57:32.064Z"},{"id":"e3a9459e-961d-4efb-a18e-4475a5d22d97","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Vloerverwarming","omschrijving":null,"status":"OPTIONEEL","templateNodeId":"scope.vloerverwarming","templateVersion":1,"ruleId":"gen.scope.vloerverwarming","createdAt":"2026-07-12T15:57:32.067Z"},{"id":"5c92a5fc-5489-416e-9e30-081c3adfe542","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Tegelwerk wand en vloer","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.tegelwerk","templateVersion":1,"ruleId":"gen.scope.tegelwerk","createdAt":"2026-07-12T15:57:32.069Z"},{"id":"8e589cc2-7af5-4798-8134-fe651d9b4f0c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Sanitair (douche, wastafel, toilet)","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.sanitair","templateVersion":1,"ruleId":"gen.scope.sanitair","createdAt":"2026-07-12T15:57:32.071Z"},{"id":"13855b71-2ee4-4748-bc95-9ed683801a1d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Afwerking en kitwerk","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.afwerking","templateVersion":1,"ruleId":"gen.scope.afwerking","createdAt":"2026-07-12T15:57:32.073Z"}],"workPackages":[{"id":"839e2728-35e1-491c-bda1-266e57c1e150","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Papierwerk & besluit","omschrijving":"Ontwerp, vergunning, verzekering, offertes en checks vóórdat je iets sloopt.","vakgebied":"algemeen","volgorde":80,"templateNodeId":"wp.papierwerk","templateVersion":4,"ruleId":"gen.wp.papierwerk","createdAt":"2026-07-12T16:49:34.770Z"},{"id":"a0f638af-ec96-40d7-8036-7e284d90419a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Regelwerk & voorbereiding","omschrijving":"Alles wat geregeld moet zijn vóór de eerste hamerslag.","vakgebied":"algemeen","volgorde":90,"templateNodeId":"wp.regelwerk","templateVersion":4,"ruleId":"gen.wp.regelwerk","createdAt":"2026-07-12T15:57:32.044Z"},{"id":"ef59f956-b255-4d41-bb32-1318115cf893","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Bestellen & levertijden","omschrijving":"Alles bestellen en wachten tot het binnen is — de échte kritieke lijn.","vakgebied":"algemeen","volgorde":95,"templateNodeId":"wp.bestellen","templateVersion":4,"ruleId":"gen.wp.bestellen","createdAt":"2026-07-12T17:19:54.578Z"},{"id":"5731b541-1ac1-4ea7-ae8b-725aedef85fc","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Voorbereiding & sloop","omschrijving":"Beschermen, afkoppelen en slopen van de oude badkamer.","vakgebied":"sloop","volgorde":100,"templateNodeId":"wp.voorbereiding","templateVersion":4,"ruleId":"gen.wp.voorbereiding","createdAt":"2026-07-12T15:57:32.048Z"},{"id":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Leidingwerk & elektra","omschrijving":"Nieuw leidingwerk, afvoeren, elektra en ventilatie (ruwbouw).","vakgebied":"installatie","volgorde":200,"templateNodeId":"wp.installaties","templateVersion":4,"ruleId":"gen.wp.installaties","createdAt":"2026-07-12T15:57:32.050Z"},{"id":"6daa90cb-0e31-4df8-af19-838becff02a9","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Afbouw & tegelwerk","omschrijving":"Smeren, waterdichten, tegelen en voegen — mét droogtijden.","vakgebied":"tegelzetten","volgorde":300,"templateNodeId":"wp.afbouw","templateVersion":4,"ruleId":"gen.wp.afbouw","createdAt":"2026-07-12T15:57:32.052Z"},{"id":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Sanitair & afwerking","omschrijving":"Plaatsen van sanitair, douchewand en afmontage.","vakgebied":"installatie","volgorde":400,"templateNodeId":"wp.sanitair","templateVersion":4,"ruleId":"gen.wp.sanitair","createdAt":"2026-07-12T15:57:32.054Z"},{"id":"50fca5a3-1a15-4508-94bc-4382d00b1cdc","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Oplevering & nazorg","omschrijving":"Opleveren, documentatie opeisen en nazorg inplannen.","vakgebied":"algemeen","volgorde":440,"templateNodeId":"wp.nazorg","templateVersion":4,"ruleId":"gen.wp.nazorg","createdAt":"2026-07-12T16:49:34.813Z"}],"tasks":[{"id":"63968b9e-5a08-4dec-b871-6ccf08ad3403","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"Ontwerp en definitieve indeling maken","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":5,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":81,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-11T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.ontwerp","templateVersion":4,"ruleId":"gen.task.ontwerp","createdAt":"2026-07-12T17:19:54.642Z","updatedAt":"2026-07-12T21:49:08.421Z"},{"id":"5b4ec5b0-cd2a-435d-9bfe-0eb168dca264","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"Vergunningcheck doen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":82,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.vergunningcheck","templateVersion":4,"ruleId":"gen.task.vergunningcheck","createdAt":"2026-07-12T16:49:34.861Z","updatedAt":"2026-07-12T21:49:08.424Z"},{"id":"673bba14-68b3-4cd8-a36a-758d0842fadb","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Mechanische ventilatie aanleggen of verbeteren","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":1,"status":"AFGEROND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":225,"geplandeStart":"2026-10-22T00:00:00.000Z","geplandeEind":"2026-10-22T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":60000,"afwijkingBevestigd":false,"templateNodeId":"task.ventilatie","templateVersion":3,"ruleId":"gen.task.ventilatie","createdAt":"2026-07-12T16:49:34.943Z","updatedAt":"2026-07-12T21:49:08.453Z"},{"id":"9898babb-6b7b-4894-944c-aba86178bdb2","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"VvE-toestemming regelen (bij appartement)","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":83,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.vve","templateVersion":4,"ruleId":"gen.task.vve","createdAt":"2026-07-12T16:49:34.865Z","updatedAt":"2026-07-12T21:49:08.426Z"},{"id":"e5548868-a278-41a3-85a8-64459bc2af7c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"Asbestcheck (woning van vóór 1994)","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":84,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":45000,"afwijkingBevestigd":false,"templateNodeId":"task.asbestcheck","templateVersion":4,"ruleId":"gen.task.asbestcheck","createdAt":"2026-07-12T16:49:34.870Z","updatedAt":"2026-07-12T21:49:08.428Z"},{"id":"d83ecb49-11dd-4ae4-9df9-ad045204226a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"Verbouwing melden bij opstalverzekering","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":85,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.verzekering","templateVersion":4,"ruleId":"gen.task.verzekering","createdAt":"2026-07-12T16:49:34.874Z","updatedAt":"2026-07-12T21:49:08.429Z"},{"id":"03ce2e7c-7145-4efc-abdb-de68f268a1c6","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"Offertes aanvragen, vergelijken en opdracht geven","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":10,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":86,"geplandeStart":"2026-09-14T00:00:00.000Z","geplandeEind":"2026-09-25T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.offertes","templateVersion":4,"ruleId":"gen.task.offertes","createdAt":"2026-07-12T16:49:34.883Z","updatedAt":"2026-07-12T21:49:08.430Z"},{"id":"3481206f-3b70-4e3e-81a5-7365a2a2a927","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"839e2728-35e1-491c-bda1-266e57c1e150","naam":"Projectmap aanmaken en alles vastleggen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":87,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.dossier","templateVersion":4,"ruleId":"gen.task.dossier","createdAt":"2026-07-12T21:49:08.279Z","updatedAt":"2026-07-12T21:49:08.435Z"},{"id":"ec5a5add-e3a7-43b7-ac03-f565464be0ef","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"a0f638af-ec96-40d7-8036-7e284d90419a","naam":"Buren informeren over de verbouwing","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":92,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.buren","templateVersion":4,"ruleId":"gen.task.buren","createdAt":"2026-07-12T15:57:32.110Z","updatedAt":"2026-07-12T21:49:08.436Z"},{"id":"c7fa01fb-1e39-4f7b-881e-b857ff802473","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"a0f638af-ec96-40d7-8036-7e284d90419a","naam":"Container, puinafvoer en parkeren regelen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":94,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":45000,"afwijkingBevestigd":false,"templateNodeId":"task.container","templateVersion":4,"ruleId":"gen.task.container","createdAt":"2026-07-12T15:57:32.117Z","updatedAt":"2026-07-12T21:49:08.438Z"},{"id":"7fedf364-f953-4fe1-b5c1-f162271560a5","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"a0f638af-ec96-40d7-8036-7e284d90419a","naam":"Tijdelijke douche en wc regelen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":96,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.tijdelijk","templateVersion":4,"ruleId":"gen.task.tijdelijk","createdAt":"2026-07-12T15:57:32.120Z","updatedAt":"2026-07-12T21:49:08.439Z"},{"id":"24734dca-d276-48b6-bc25-0174ffd3eb78","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"a0f638af-ec96-40d7-8036-7e284d90419a","naam":"Meten of alles door de deur en het trapgat past","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":97,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.doorgang","templateVersion":4,"ruleId":"gen.task.doorgang","createdAt":"2026-07-12T16:49:34.900Z","updatedAt":"2026-07-12T21:49:08.440Z"},{"id":"bbc36c34-9c12-4f25-b03d-6fd5edecf6eb","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"a0f638af-ec96-40d7-8036-7e284d90419a","naam":"Nulmeting: foto's van de bestaande situatie","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":98,"geplandeStart":"2026-09-07T00:00:00.000Z","geplandeEind":"2026-09-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.nulmeting","templateVersion":4,"ruleId":"gen.task.nulmeting","createdAt":"2026-07-12T16:49:34.903Z","updatedAt":"2026-07-12T21:49:08.441Z"},{"id":"52db3583-bc1e-42f1-81e9-1e9786f75a31","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ef59f956-b255-4d41-bb32-1318115cf893","naam":"Sanitair, tegels en inbouwdelen bestellen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":99,"geplandeStart":"2026-09-28T00:00:00.000Z","geplandeEind":"2026-09-28T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.bestellen","templateVersion":4,"ruleId":"gen.task.bestellen","createdAt":"2026-07-12T17:19:54.679Z","updatedAt":"2026-07-12T21:49:08.442Z"},{"id":"6d478e72-ecd4-40fd-b42d-7870c87c86f0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ef59f956-b255-4d41-bb32-1318115cf893","naam":"Wachten op leveringen en controleren bij ontvangst","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":15,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":100,"geplandeStart":"2026-09-29T00:00:00.000Z","geplandeEind":"2026-10-19T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.leveringen","templateVersion":4,"ruleId":"gen.task.leveringen","createdAt":"2026-07-12T17:19:54.688Z","updatedAt":"2026-07-12T21:49:08.443Z"},{"id":"ff045730-0d0c-4716-a2fa-c787ca9c684c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"5731b541-1ac1-4ea7-ae8b-725aedef85fc","naam":"Werkgebied beschermen en afdekken","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":110,"geplandeStart":"2026-09-28T00:00:00.000Z","geplandeEind":"2026-09-28T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":15000,"afwijkingBevestigd":false,"templateNodeId":"task.beschermen","templateVersion":4,"ruleId":"gen.task.beschermen","createdAt":"2026-07-12T15:57:32.123Z","updatedAt":"2026-07-12T21:49:08.445Z"},{"id":"32de65cd-8fee-4ad8-b0f1-86b0114b753f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"5731b541-1ac1-4ea7-ae8b-725aedef85fc","naam":"Water en elektra afkoppelen","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":120,"geplandeStart":"2026-09-29T00:00:00.000Z","geplandeEind":"2026-09-29T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":25000,"afwijkingBevestigd":false,"templateNodeId":"task.afkoppelen","templateVersion":4,"ruleId":"gen.task.afkoppelen","createdAt":"2026-07-12T15:57:32.129Z","updatedAt":"2026-07-12T21:49:08.446Z"},{"id":"12cfcf99-a6ad-4899-a105-b4606765f714","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"5731b541-1ac1-4ea7-ae8b-725aedef85fc","naam":"Oude badkamer slopen en afvoeren","omschrijving":null,"vakgebied":"sloop","duurWerkdagen":2,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":130,"geplandeStart":"2026-10-20T00:00:00.000Z","geplandeEind":"2026-10-21T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":80000,"afwijkingBevestigd":false,"templateNodeId":"task.slopen","templateVersion":4,"ruleId":"gen.task.slopen","createdAt":"2026-07-12T15:57:32.137Z","updatedAt":"2026-07-12T21:49:08.447Z"},{"id":"c1b74356-0e89-479d-a205-2d308217de12","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Hoogtes en posities aftekenen en samen nalopen","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":1,"status":"AFGEROND","classificatie":"VRIJ","uitvoerder":"ZELF","volgorde":205,"geplandeStart":"2026-10-22T00:00:00.000Z","geplandeEind":"2026-10-22T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.hoogtes","templateVersion":3,"ruleId":"gen.task.hoogtes","createdAt":"2026-07-12T16:49:34.923Z","updatedAt":"2026-07-12T21:49:08.448Z"},{"id":"d52889e1-cd51-40db-8e0d-146ee95aff75","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Nieuw leidingwerk en afvoeren aanleggen","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":3,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":210,"geplandeStart":"2026-10-23T00:00:00.000Z","geplandeEind":"2026-10-27T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":180000,"afwijkingBevestigd":false,"templateNodeId":"task.leidingwerk","templateVersion":4,"ruleId":"gen.task.leidingwerk","createdAt":"2026-07-12T15:57:32.144Z","updatedAt":"2026-07-12T21:49:08.450Z"},{"id":"cca9d63e-6d57-4521-9bc5-b21c10867a9f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Leidingwerk afpersen (druktest)","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":215,"geplandeStart":"2026-10-28T00:00:00.000Z","geplandeEind":"2026-10-28T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":10000,"afwijkingBevestigd":false,"templateNodeId":"task.afpersen","templateVersion":4,"ruleId":"gen.task.afpersen","createdAt":"2026-07-12T15:57:32.153Z","updatedAt":"2026-07-12T21:49:08.451Z"},{"id":"49bb74d5-eb68-456f-ab17-f4c0cb193fff","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Elektra aanleggen (groepen, aarding, spatwaterzones)","omschrijving":null,"vakgebied":"elektra","duurWerkdagen":2,"status":"GEPLAND","classificatie":"VERPLICHT_GEKWALIFICEERD","uitvoerder":"ONBESLIST","volgorde":220,"geplandeStart":"2026-10-23T00:00:00.000Z","geplandeEind":"2026-10-26T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":140000,"afwijkingBevestigd":false,"templateNodeId":"task.elektra","templateVersion":4,"ruleId":"gen.task.elektra","createdAt":"2026-07-12T15:57:32.158Z","updatedAt":"2026-07-12T21:49:08.452Z"},{"id":"7be9cca1-e1ed-4168-a1b6-10f2fbe83f99","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Vloerverwarming aanbrengen","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":230,"geplandeStart":"2026-10-28T00:00:00.000Z","geplandeEind":"2026-10-28T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":90000,"afwijkingBevestigd":false,"templateNodeId":"task.vloerverwarming","templateVersion":4,"ruleId":"gen.task.vloerverwarming","createdAt":"2026-07-12T15:57:32.163Z","updatedAt":"2026-07-12T21:49:08.454Z"},{"id":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","naam":"Laatste controle vóór dichtbouwen (onomkeerbaar werk)","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":235,"geplandeStart":"2026-10-29T00:00:00.000Z","geplandeEind":"2026-10-29T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.dichtbouw","templateVersion":4,"ruleId":"gen.task.dichtbouw","createdAt":"2026-07-12T21:49:08.300Z","updatedAt":"2026-07-12T21:49:08.455Z"},{"id":"159a96f5-6673-4acb-9d04-6441ade2c516","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","naam":"Wanden en vloer uitvlakken/smeren","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":2,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":310,"geplandeStart":"2026-10-30T00:00:00.000Z","geplandeEind":"2026-11-02T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":60000,"afwijkingBevestigd":false,"templateNodeId":"task.smeren","templateVersion":4,"ruleId":"gen.task.smeren","createdAt":"2026-07-12T15:57:32.178Z","updatedAt":"2026-07-12T21:49:08.456Z"},{"id":"69599a61-ce0e-4849-ba44-7ad3b97ab9a8","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","naam":"Droogtijd dekvloer en egaline (niets forceren)","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":3,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":312,"geplandeStart":"2026-11-03T00:00:00.000Z","geplandeEind":"2026-11-05T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.droogtijd","templateVersion":4,"ruleId":"gen.task.droogtijd","createdAt":"2026-07-12T17:19:54.724Z","updatedAt":"2026-07-12T21:49:08.459Z"},{"id":"ada84bb7-b766-4dc9-a36f-4d301d55cd63","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","naam":"Plafond stuken of spuiten","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":315,"geplandeStart":"2026-11-03T00:00:00.000Z","geplandeEind":"2026-11-03T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":40000,"afwijkingBevestigd":false,"templateNodeId":"task.plafond","templateVersion":4,"ruleId":"gen.task.plafond","createdAt":"2026-07-12T16:49:34.956Z","updatedAt":"2026-07-12T21:49:08.460Z"},{"id":"36109b3c-8225-482e-807e-7e1b87a70f5a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","naam":"Waterdichting aanbrengen (kimband, coating)","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":320,"geplandeStart":"2026-11-06T00:00:00.000Z","geplandeEind":"2026-11-06T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":35000,"afwijkingBevestigd":false,"templateNodeId":"task.waterdicht","templateVersion":4,"ruleId":"gen.task.waterdicht","createdAt":"2026-07-12T15:57:32.180Z","updatedAt":"2026-07-12T21:49:08.462Z"},{"id":"80799494-27f5-4fbd-9edb-f32743d49f33","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","naam":"Wand- en vloertegels zetten","omschrijving":null,"vakgebied":"tegelzetten","duurWerkdagen":4,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":330,"geplandeStart":"2026-11-09T00:00:00.000Z","geplandeEind":"2026-11-12T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":380000,"afwijkingBevestigd":false,"templateNodeId":"task.tegelen","templateVersion":4,"ruleId":"gen.task.tegelen","createdAt":"2026-07-12T15:57:32.183Z","updatedAt":"2026-07-12T21:49:08.463Z"},{"id":"210c452e-9d2e-491d-b685-47d8255912f1","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","naam":"Voegen en kimkit aanbrengen","omschrijving":null,"vakgebied":"tegelzetten","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":340,"geplandeStart":"2026-11-13T00:00:00.000Z","geplandeEind":"2026-11-13T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":60000,"afwijkingBevestigd":false,"templateNodeId":"task.voegen","templateVersion":4,"ruleId":"gen.task.voegen","createdAt":"2026-07-12T15:57:32.189Z","updatedAt":"2026-07-12T21:49:08.465Z"},{"id":"cd4a9304-9bfc-4e27-a9b4-b590a43b806a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","naam":"Maatwerk douchewand: inmeten, levertijd en plaatsen","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":10,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":405,"geplandeStart":"2026-11-16T00:00:00.000Z","geplandeEind":"2026-11-27T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":120000,"afwijkingBevestigd":false,"templateNodeId":"task.glas","templateVersion":4,"ruleId":"gen.task.glas","createdAt":"2026-07-12T16:49:34.969Z","updatedAt":"2026-07-12T21:49:08.466Z"},{"id":"cfb5ae14-7a07-4ef6-b6bb-053300960736","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","naam":"Sanitair plaatsen en aansluiten","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":2,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":410,"geplandeStart":"2026-11-16T00:00:00.000Z","geplandeEind":"2026-11-17T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":320000,"afwijkingBevestigd":false,"templateNodeId":"task.sanitair","templateVersion":4,"ruleId":"gen.task.sanitair","createdAt":"2026-07-12T15:57:32.194Z","updatedAt":"2026-07-12T21:49:08.468Z"},{"id":"83094c0e-e4cc-4f96-8329-31f0f8fd3ceb","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","naam":"Elektra afmonteren (verlichting, schakelaars)","omschrijving":null,"vakgebied":"elektra","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VERPLICHT_GEKWALIFICEERD","uitvoerder":"ONBESLIST","volgorde":420,"geplandeStart":"2026-11-16T00:00:00.000Z","geplandeEind":"2026-11-16T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":60000,"afwijkingBevestigd":false,"templateNodeId":"task.afmonteren","templateVersion":4,"ruleId":"gen.task.afmonteren","createdAt":"2026-07-12T15:57:32.202Z","updatedAt":"2026-07-12T21:49:08.470Z"},{"id":"cf73fa1a-505d-4f94-b201-ef837aa874df","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","naam":"Waterproef: douche, afvoeren en aansluitingen testen","omschrijving":null,"vakgebied":"installatie","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":425,"geplandeStart":"2026-11-18T00:00:00.000Z","geplandeEind":"2026-11-18T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.watertest","templateVersion":4,"ruleId":"gen.task.watertest","createdAt":"2026-07-12T21:49:08.312Z","updatedAt":"2026-07-12T21:49:08.471Z"},{"id":"9a6e9deb-d191-4fe9-8ba3-1b96adaaa820","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","naam":"Vooroplevering, eindschoonmaak en oplevering","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":430,"geplandeStart":"2026-11-30T00:00:00.000Z","geplandeEind":"2026-11-30T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":10000,"afwijkingBevestigd":false,"templateNodeId":"task.oplevering","templateVersion":4,"ruleId":"gen.task.oplevering","createdAt":"2026-07-12T15:57:32.205Z","updatedAt":"2026-07-12T21:49:08.473Z"},{"id":"8d8844fb-d7dd-4d92-816d-fe203ccf6f01","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"50fca5a3-1a15-4508-94bc-4382d00b1cdc","naam":"Bouwvocht wegventileren","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":5,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":442,"geplandeStart":"2026-12-01T00:00:00.000Z","geplandeEind":"2026-12-07T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.ventileren","templateVersion":4,"ruleId":"gen.task.ventileren","createdAt":"2026-07-12T16:49:34.985Z","updatedAt":"2026-07-12T21:49:08.474Z"},{"id":"7b232437-3b4b-4d85-83d7-df896fa8aec3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"50fca5a3-1a15-4508-94bc-4382d00b1cdc","naam":"Nazorgmoment: kit, voegen en vloerverwarming nalopen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":445,"geplandeStart":"2026-12-08T00:00:00.000Z","geplandeEind":"2026-12-08T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.nazorg","templateVersion":4,"ruleId":"gen.task.nazorg","createdAt":"2026-07-12T16:49:34.988Z","updatedAt":"2026-07-12T21:49:08.475Z"}],"dependencies":[{"id":"9bf9096b-9ec9-445a-aed7-890254fa062f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"32de65cd-8fee-4ad8-b0f1-86b0114b753f","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.afkoppelen->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.afkoppelen->task.slopen","createdAt":"2026-07-12T21:49:08.325Z"},{"id":"bd4917a9-9f42-4e1c-84ee-6e2392881b1d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"83094c0e-e4cc-4f96-8329-31f0f8fd3ceb","successorId":"9a6e9deb-d191-4fe9-8ba3-1b96adaaa820","templateNodeId":"task.afmonteren->task.oplevering","templateVersion":4,"ruleId":"gen.dep.task.afmonteren->task.oplevering","createdAt":"2026-07-12T21:49:08.326Z"},{"id":"89c36c83-5ca6-4d5f-9a75-f3396cf2c964","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"cca9d63e-6d57-4521-9bc5-b21c10867a9f","successorId":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","templateNodeId":"task.afpersen->task.dichtbouw","templateVersion":4,"ruleId":"gen.dep.task.afpersen->task.dichtbouw","createdAt":"2026-07-12T21:49:08.327Z"},{"id":"54d4ca07-b061-4ba4-95d6-ff38ec18762b","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"e5548868-a278-41a3-85a8-64459bc2af7c","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.asbestcheck->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.asbestcheck->task.slopen","createdAt":"2026-07-12T21:49:08.328Z"},{"id":"13da41bc-8ebe-43cd-9c60-a9b971de717e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"ff045730-0d0c-4716-a2fa-c787ca9c684c","successorId":"32de65cd-8fee-4ad8-b0f1-86b0114b753f","templateNodeId":"task.beschermen->task.afkoppelen","templateVersion":4,"ruleId":"gen.dep.task.beschermen->task.afkoppelen","createdAt":"2026-07-12T21:49:08.329Z"},{"id":"0d7409de-003a-4936-8298-3a11af059cc9","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"52db3583-bc1e-42f1-81e9-1e9786f75a31","successorId":"6d478e72-ecd4-40fd-b42d-7870c87c86f0","templateNodeId":"task.bestellen->task.leveringen","templateVersion":4,"ruleId":"gen.dep.task.bestellen->task.leveringen","createdAt":"2026-07-12T21:49:08.330Z"},{"id":"39006725-7cef-4659-acae-39b2d8d2a48d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"ec5a5add-e3a7-43b7-ac03-f565464be0ef","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.buren->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.buren->task.slopen","createdAt":"2026-07-12T21:49:08.331Z"},{"id":"a93e5488-07cb-4a9a-8ea9-f07433dfbabe","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"c7fa01fb-1e39-4f7b-881e-b857ff802473","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.container->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.container->task.slopen","createdAt":"2026-07-12T21:49:08.332Z"},{"id":"8b9e6e21-4ffb-4d48-9eb9-24d6f6c05c36","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","successorId":"159a96f5-6673-4acb-9d04-6441ade2c516","templateNodeId":"task.dichtbouw->task.smeren","templateVersion":4,"ruleId":"gen.dep.task.dichtbouw->task.smeren","createdAt":"2026-07-12T21:49:08.333Z"},{"id":"5742258a-3bf9-4f6b-927e-9b44667c33df","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"24734dca-d276-48b6-bc25-0174ffd3eb78","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.doorgang->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.doorgang->task.slopen","createdAt":"2026-07-12T21:49:08.334Z"},{"id":"ff7e815f-0c89-4a51-913f-9eb7fbb2a328","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"3481206f-3b70-4e3e-81a5-7365a2a2a927","successorId":"52db3583-bc1e-42f1-81e9-1e9786f75a31","templateNodeId":"task.dossier->task.bestellen","templateVersion":4,"ruleId":"gen.dep.task.dossier->task.bestellen","createdAt":"2026-07-12T21:49:08.335Z"},{"id":"cfa8134d-b273-43a6-b0b9-016774b97176","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"69599a61-ce0e-4849-ba44-7ad3b97ab9a8","successorId":"36109b3c-8225-482e-807e-7e1b87a70f5a","templateNodeId":"task.droogtijd->task.waterdicht","templateVersion":4,"ruleId":"gen.dep.task.droogtijd->task.waterdicht","createdAt":"2026-07-12T21:49:08.336Z"},{"id":"c09986a1-8369-4573-84ef-89988a673571","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"49bb74d5-eb68-456f-ab17-f4c0cb193fff","successorId":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","templateNodeId":"task.elektra->task.dichtbouw","templateVersion":4,"ruleId":"gen.dep.task.elektra->task.dichtbouw","createdAt":"2026-07-12T21:49:08.337Z"},{"id":"c1e070a0-b074-41bf-89d2-072e36742077","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"cd4a9304-9bfc-4e27-a9b4-b590a43b806a","successorId":"9a6e9deb-d191-4fe9-8ba3-1b96adaaa820","templateNodeId":"task.glas->task.oplevering","templateVersion":4,"ruleId":"gen.dep.task.glas->task.oplevering","createdAt":"2026-07-12T21:49:08.338Z"},{"id":"727ad4df-ac1d-4a26-af5f-a8ba86030871","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"c1b74356-0e89-479d-a205-2d308217de12","successorId":"49bb74d5-eb68-456f-ab17-f4c0cb193fff","templateNodeId":"task.hoogtes->task.elektra","templateVersion":4,"ruleId":"gen.dep.task.hoogtes->task.elektra","createdAt":"2026-07-12T21:49:08.338Z"},{"id":"96f033b3-ada7-462c-b8ff-a18466035159","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"c1b74356-0e89-479d-a205-2d308217de12","successorId":"d52889e1-cd51-40db-8e0d-146ee95aff75","templateNodeId":"task.hoogtes->task.leidingwerk","templateVersion":4,"ruleId":"gen.dep.task.hoogtes->task.leidingwerk","createdAt":"2026-07-12T21:49:08.339Z"},{"id":"8c7ebf8a-3075-4d66-bf51-d3c467b303df","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"d52889e1-cd51-40db-8e0d-146ee95aff75","successorId":"cca9d63e-6d57-4521-9bc5-b21c10867a9f","templateNodeId":"task.leidingwerk->task.afpersen","templateVersion":4,"ruleId":"gen.dep.task.leidingwerk->task.afpersen","createdAt":"2026-07-12T21:49:08.340Z"},{"id":"2b0bedec-b33c-4b41-babf-c2b4bd213812","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"d52889e1-cd51-40db-8e0d-146ee95aff75","successorId":"7be9cca1-e1ed-4168-a1b6-10f2fbe83f99","templateNodeId":"task.leidingwerk->task.vloerverwarming","templateVersion":4,"ruleId":"gen.dep.task.leidingwerk->task.vloerverwarming","createdAt":"2026-07-12T21:49:08.341Z"},{"id":"88ea1725-1c4e-453c-8be0-e12f8e4cc1a5","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"6d478e72-ecd4-40fd-b42d-7870c87c86f0","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.leveringen->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.leveringen->task.slopen","createdAt":"2026-07-12T21:49:08.342Z"},{"id":"692cfb1b-44a6-443f-955f-c67e0c94abf5","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"bbc36c34-9c12-4f25-b03d-6fd5edecf6eb","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.nulmeting->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.nulmeting->task.slopen","createdAt":"2026-07-12T21:49:08.344Z"},{"id":"f89be9e5-9f51-4225-a8a7-86b627a26f07","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"03ce2e7c-7145-4efc-abdb-de68f268a1c6","successorId":"ff045730-0d0c-4716-a2fa-c787ca9c684c","templateNodeId":"task.offertes->task.beschermen","templateVersion":4,"ruleId":"gen.dep.task.offertes->task.beschermen","createdAt":"2026-07-12T21:49:08.345Z"},{"id":"4e5c9c82-99ca-46c4-b589-08db40c70f67","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"03ce2e7c-7145-4efc-abdb-de68f268a1c6","successorId":"52db3583-bc1e-42f1-81e9-1e9786f75a31","templateNodeId":"task.offertes->task.bestellen","templateVersion":4,"ruleId":"gen.dep.task.offertes->task.bestellen","createdAt":"2026-07-12T21:49:08.346Z"},{"id":"b8a8ffdf-fabf-4a8f-9900-34409401008c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"63968b9e-5a08-4dec-b871-6ccf08ad3403","successorId":"52db3583-bc1e-42f1-81e9-1e9786f75a31","templateNodeId":"task.ontwerp->task.bestellen","templateVersion":4,"ruleId":"gen.dep.task.ontwerp->task.bestellen","createdAt":"2026-07-12T21:49:08.347Z"},{"id":"255548b4-23c8-4d71-af84-fdf9eb8a6c3b","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"63968b9e-5a08-4dec-b871-6ccf08ad3403","successorId":"03ce2e7c-7145-4efc-abdb-de68f268a1c6","templateNodeId":"task.ontwerp->task.offertes","templateVersion":4,"ruleId":"gen.dep.task.ontwerp->task.offertes","createdAt":"2026-07-12T21:49:08.347Z"},{"id":"4a7d462d-f100-4d3e-9890-c5feafac3839","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"9a6e9deb-d191-4fe9-8ba3-1b96adaaa820","successorId":"8d8844fb-d7dd-4d92-816d-fe203ccf6f01","templateNodeId":"task.oplevering->task.ventileren","templateVersion":4,"ruleId":"gen.dep.task.oplevering->task.ventileren","createdAt":"2026-07-12T21:49:08.348Z"},{"id":"811ebbd8-42ca-4832-9fa7-d00ab549cde4","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"ada84bb7-b766-4dc9-a36f-4d301d55cd63","successorId":"80799494-27f5-4fbd-9edb-f32743d49f33","templateNodeId":"task.plafond->task.tegelen","templateVersion":4,"ruleId":"gen.dep.task.plafond->task.tegelen","createdAt":"2026-07-12T21:49:08.349Z"},{"id":"ea9566ae-6c2d-4fda-a2ad-ed03816f152f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"cfb5ae14-7a07-4ef6-b6bb-053300960736","successorId":"cf73fa1a-505d-4f94-b201-ef837aa874df","templateNodeId":"task.sanitair->task.watertest","templateVersion":4,"ruleId":"gen.dep.task.sanitair->task.watertest","createdAt":"2026-07-12T21:49:08.350Z"},{"id":"f35dd307-1e2c-4d2b-8fcb-1371ac00b22c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"12cfcf99-a6ad-4899-a105-b4606765f714","successorId":"c1b74356-0e89-479d-a205-2d308217de12","templateNodeId":"task.slopen->task.hoogtes","templateVersion":4,"ruleId":"gen.dep.task.slopen->task.hoogtes","createdAt":"2026-07-12T21:49:08.351Z"},{"id":"183f1850-ace9-4796-93a7-8653252bbcc3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"12cfcf99-a6ad-4899-a105-b4606765f714","successorId":"673bba14-68b3-4cd8-a36a-758d0842fadb","templateNodeId":"task.slopen->task.ventilatie","templateVersion":4,"ruleId":"gen.dep.task.slopen->task.ventilatie","createdAt":"2026-07-12T21:49:08.352Z"},{"id":"720d3aed-04c0-4c50-bbdd-86ecb39bbc73","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"159a96f5-6673-4acb-9d04-6441ade2c516","successorId":"69599a61-ce0e-4849-ba44-7ad3b97ab9a8","templateNodeId":"task.smeren->task.droogtijd","templateVersion":4,"ruleId":"gen.dep.task.smeren->task.droogtijd","createdAt":"2026-07-12T21:49:08.353Z"},{"id":"93784437-7d75-4ff0-b1b3-e41d0d15fce3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"159a96f5-6673-4acb-9d04-6441ade2c516","successorId":"ada84bb7-b766-4dc9-a36f-4d301d55cd63","templateNodeId":"task.smeren->task.plafond","templateVersion":4,"ruleId":"gen.dep.task.smeren->task.plafond","createdAt":"2026-07-12T21:49:08.354Z"},{"id":"b9103cc5-6403-4bc3-911d-54889436af5f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"80799494-27f5-4fbd-9edb-f32743d49f33","successorId":"210c452e-9d2e-491d-b685-47d8255912f1","templateNodeId":"task.tegelen->task.voegen","templateVersion":4,"ruleId":"gen.dep.task.tegelen->task.voegen","createdAt":"2026-07-12T21:49:08.354Z"},{"id":"aca68e75-b4f7-4e15-9162-18792af3942a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"7fedf364-f953-4fe1-b5c1-f162271560a5","successorId":"32de65cd-8fee-4ad8-b0f1-86b0114b753f","templateNodeId":"task.tijdelijk->task.afkoppelen","templateVersion":4,"ruleId":"gen.dep.task.tijdelijk->task.afkoppelen","createdAt":"2026-07-12T21:49:08.355Z"},{"id":"9d0b49ff-67a4-422a-9e5d-24243f12b090","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"673bba14-68b3-4cd8-a36a-758d0842fadb","successorId":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","templateNodeId":"task.ventilatie->task.dichtbouw","templateVersion":4,"ruleId":"gen.dep.task.ventilatie->task.dichtbouw","createdAt":"2026-07-12T21:49:08.356Z"},{"id":"308bd91c-3a7b-40ee-9f5e-ccc32570caf9","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"8d8844fb-d7dd-4d92-816d-fe203ccf6f01","successorId":"7b232437-3b4b-4d85-83d7-df896fa8aec3","templateNodeId":"task.ventileren->task.nazorg","templateVersion":4,"ruleId":"gen.dep.task.ventileren->task.nazorg","createdAt":"2026-07-12T21:49:08.357Z"},{"id":"a3311711-3941-4fef-9f4e-91103a4e9613","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"5b4ec5b0-cd2a-435d-9bfe-0eb168dca264","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.vergunningcheck->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.vergunningcheck->task.slopen","createdAt":"2026-07-12T21:49:08.358Z"},{"id":"43ad7473-5442-4898-880a-de4bc9d854e8","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"d83ecb49-11dd-4ae4-9df9-ad045204226a","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.verzekering->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.verzekering->task.slopen","createdAt":"2026-07-12T21:49:08.359Z"},{"id":"dd489467-087c-4149-9671-c334f49b8914","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"7be9cca1-e1ed-4168-a1b6-10f2fbe83f99","successorId":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","templateNodeId":"task.vloerverwarming->task.dichtbouw","templateVersion":4,"ruleId":"gen.dep.task.vloerverwarming->task.dichtbouw","createdAt":"2026-07-12T21:49:08.360Z"},{"id":"c311b045-da17-4bbd-976d-e75a034c9cd1","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"210c452e-9d2e-491d-b685-47d8255912f1","successorId":"83094c0e-e4cc-4f96-8329-31f0f8fd3ceb","templateNodeId":"task.voegen->task.afmonteren","templateVersion":4,"ruleId":"gen.dep.task.voegen->task.afmonteren","createdAt":"2026-07-12T21:49:08.361Z"},{"id":"99d2da2d-a037-40de-8334-278250bb0269","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"210c452e-9d2e-491d-b685-47d8255912f1","successorId":"cd4a9304-9bfc-4e27-a9b4-b590a43b806a","templateNodeId":"task.voegen->task.glas","templateVersion":4,"ruleId":"gen.dep.task.voegen->task.glas","createdAt":"2026-07-12T21:49:08.362Z"},{"id":"1a0348db-5d83-4425-bd29-5db54cccc797","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"210c452e-9d2e-491d-b685-47d8255912f1","successorId":"cfb5ae14-7a07-4ef6-b6bb-053300960736","templateNodeId":"task.voegen->task.sanitair","templateVersion":4,"ruleId":"gen.dep.task.voegen->task.sanitair","createdAt":"2026-07-12T21:49:08.363Z"},{"id":"a1a7d5b5-85f9-4604-8895-d13604047d7c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"9898babb-6b7b-4894-944c-aba86178bdb2","successorId":"12cfcf99-a6ad-4899-a105-b4606765f714","templateNodeId":"task.vve->task.slopen","templateVersion":4,"ruleId":"gen.dep.task.vve->task.slopen","createdAt":"2026-07-12T21:49:08.364Z"},{"id":"d7b29c16-99a3-459d-a0e0-0294a2656d0c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"36109b3c-8225-482e-807e-7e1b87a70f5a","successorId":"80799494-27f5-4fbd-9edb-f32743d49f33","templateNodeId":"task.waterdicht->task.tegelen","templateVersion":4,"ruleId":"gen.dep.task.waterdicht->task.tegelen","createdAt":"2026-07-12T21:49:08.364Z"},{"id":"debe44f5-7027-4c36-8bef-d4b988b24692","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","predecessorId":"cf73fa1a-505d-4f94-b201-ef837aa874df","successorId":"9a6e9deb-d191-4fe9-8ba3-1b96adaaa820","templateNodeId":"task.watertest->task.oplevering","templateVersion":4,"ruleId":"gen.dep.task.watertest->task.oplevering","createdAt":"2026-07-12T21:49:08.365Z"}],"decisions":[{"id":"17e95dac-90fb-45f9-a49b-d24f82d07b7e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Wel of geen elektrische vloerverwarming","omschrijving":"Bepaalt opbouwhoogte en elektrawerk.","status":"OPEN","uitersteBeslisdatum":"2026-10-19T00:00:00.000Z","ankerBeslisdatum":null,"beslistOp":null,"keuze":null,"bufferWerkdagen":2,"templateNodeId":"dec.vloerverwarming","templateVersion":4,"ruleId":"gen.dec.vloerverwarming","createdAt":"2026-07-12T15:57:32.083Z"},{"id":"64a6792d-52d7-4308-a038-6654b793cd69","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Kleur voegen en kit kiezen","omschrijving":"Voeg- en kitkleur bepalen het eindbeeld; bestel gelijk met de tegels.","status":"OPEN","uitersteBeslisdatum":"2026-09-24T00:00:00.000Z","ankerBeslisdatum":null,"beslistOp":null,"keuze":null,"bufferWerkdagen":2,"templateNodeId":"dec.voegkleur","templateVersion":4,"ruleId":"gen.dec.voegkleur","createdAt":"2026-07-12T16:49:34.833Z"},{"id":"8a30114d-d319-4282-a671-1590b5590f2a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Keuze wand- en vloertegels","omschrijving":"Formaat, kleur en antislipklasse bepalen mede het tegelwerk.","status":"OPEN","uitersteBeslisdatum":"2026-10-21T00:00:00.000Z","ankerBeslisdatum":null,"beslistOp":null,"keuze":null,"bufferWerkdagen":3,"templateNodeId":"dec.tegels","templateVersion":4,"ruleId":"gen.dec.tegels","createdAt":"2026-07-12T15:57:32.077Z"},{"id":"c72cb1a7-1112-46a7-a909-c236d8fa2428","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Keuze sanitair","omschrijving":"Douche(set), wastafelmeubel, toilet en kranen.","status":"OPEN","uitersteBeslisdatum":"2026-08-14T00:00:00.000Z","ankerBeslisdatum":"2026-08-14T00:00:00.000Z","beslistOp":null,"keuze":null,"bufferWerkdagen":3,"templateNodeId":"dec.sanitair","templateVersion":4,"ruleId":"gen.dec.sanitair","createdAt":"2026-07-12T15:57:32.080Z"}],"materials":[{"id":"43ff3d92-f053-425c-92a4-f093d008766e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Sanitairset","levertijdWerkdagen":15,"bestelStatus":"NIET_BESTELD","besteldatum":"2026-10-26T00:00:00.000Z","leverdatum":null,"decisionId":"c72cb1a7-1112-46a7-a909-c236d8fa2428","templateNodeId":"mat.sanitair","templateVersion":4,"ruleId":"gen.mat.sanitair","createdAt":"2026-07-12T15:57:32.092Z"},{"id":"bdf5f234-e0ac-482d-bb0e-e9cb547e735d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Wand- en vloertegels","levertijdWerkdagen":10,"bestelStatus":"NIET_BESTELD","besteldatum":"2026-10-26T00:00:00.000Z","leverdatum":null,"decisionId":"8a30114d-d319-4282-a671-1590b5590f2a","templateNodeId":"mat.tegels","templateVersion":4,"ruleId":"gen.mat.tegels","createdAt":"2026-07-12T15:57:32.086Z"},{"id":"d8b99628-05e8-4423-9380-3f51b9212414","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Leidingwerk en afvoermateriaal","levertijdWerkdagen":3,"bestelStatus":"NIET_BESTELD","besteldatum":"2026-10-20T00:00:00.000Z","leverdatum":null,"decisionId":null,"templateNodeId":"mat.leidingwerk","templateVersion":4,"ruleId":"gen.mat.leidingwerk","createdAt":"2026-07-12T15:57:32.098Z"},{"id":"dbede900-07c9-4252-98df-95a3d9a40ee9","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","naam":"Elektrische vloerverwarmingsmat","levertijdWerkdagen":5,"bestelStatus":"NIET_BESTELD","besteldatum":"2026-10-21T00:00:00.000Z","leverdatum":null,"decisionId":"17e95dac-90fb-45f9-a49b-d24f82d07b7e","templateNodeId":"mat.vloerverwarming","templateVersion":4,"ruleId":"gen.mat.vloerverwarming","createdAt":"2026-07-12T15:57:32.102Z"}],"budgetItems":[{"id":"a0010e71-a22a-47dc-9b10-eb788879e17e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"5731b541-1ac1-4ea7-ae8b-725aedef85fc","scopeItemId":"e5996ad7-faec-4da0-a4fb-435f877d8440","taskId":null,"naam":"Sloopwerk en afvoer","status":"RAMING","bedragCents":120000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.sloop","templateVersion":1,"ruleId":"gen.budget.sloop","createdAt":"2026-07-12T15:57:32.267Z","updatedAt":"2026-07-12T15:57:32.267Z"},{"id":"51f1d861-8365-433c-958b-c56f5363c9fb","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","scopeItemId":"5dd95394-27e6-43cb-98cd-3e45e8bd6ac6","taskId":null,"naam":"Leidingwerk en elektra","status":"RAMING","bedragCents":380000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.installaties","templateVersion":1,"ruleId":"gen.budget.installaties","createdAt":"2026-07-12T15:57:32.271Z","updatedAt":"2026-07-12T15:57:32.271Z"},{"id":"4a610a88-5f85-42de-92f0-a82fa8c76418","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"c0ed1da9-9bb6-4340-bff8-4e9c7f877223","scopeItemId":"e3a9459e-961d-4efb-a18e-4475a5d22d97","taskId":null,"naam":"Vloerverwarming","status":"RAMING","bedragCents":90000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.vloerverwarming","templateVersion":1,"ruleId":"gen.budget.vloerverwarming","createdAt":"2026-07-12T15:57:32.273Z","updatedAt":"2026-07-12T15:57:32.273Z"},{"id":"1bce8c71-b4fc-4ec5-8935-9b556a6f4f0d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"6daa90cb-0e31-4df8-af19-838becff02a9","scopeItemId":"5c92a5fc-5489-416e-9e30-081c3adfe542","taskId":null,"naam":"Tegelwerk (arbeid en materiaal)","status":"RAMING","bedragCents":550000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.tegelwerk","templateVersion":1,"ruleId":"gen.budget.tegelwerk","createdAt":"2026-07-12T15:57:32.276Z","updatedAt":"2026-07-12T15:57:32.276Z"},{"id":"9d995198-8ffa-4d96-b4f6-3872a883efc0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","workPackageId":"ed07bc86-ffaa-40a0-b1cc-60f6099e408a","scopeItemId":"8e589cc2-7af5-4798-8134-fe651d9b4f0c","taskId":null,"naam":"Sanitair (levering en montage)","status":"RAMING","bedragCents":420000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.sanitair","templateVersion":1,"ruleId":"gen.budget.sanitair","createdAt":"2026-07-12T15:57:32.281Z","updatedAt":"2026-07-12T15:57:32.281Z"}],"quotes":[],"photos":[],"qualityGates":[{"id":"10aa81cf-1a8a-4e29-bdb5-b474ad10bce0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","taskId":"d52889e1-cd51-40db-8e0d-146ee95aff75","naam":"Foto leidingwerk vóór dichtsmeren","type":"FOTO","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.leidingwerk","templateVersion":1,"ruleId":"gen.gate.leidingwerk","createdAt":"2026-07-12T15:57:32.251Z"},{"id":"3efc8300-0205-44bb-93e3-892e27d5b04f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","taskId":"49bb74d5-eb68-456f-ab17-f4c0cb193fff","naam":"Bewijs gekwalificeerde uitvoering elektra","type":"GEKWALIFICEERD_BEWIJS","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.elektra","templateVersion":1,"ruleId":"gen.gate.elektra","createdAt":"2026-07-12T15:57:32.255Z"},{"id":"7fb9a08e-cd50-4c97-a197-ffdb03050485","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","taskId":"36109b3c-8225-482e-807e-7e1b87a70f5a","naam":"Controle waterdichting vóór tegelen","type":"CONTROLE","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.waterdicht","templateVersion":1,"ruleId":"gen.gate.waterdicht","createdAt":"2026-07-12T15:57:32.258Z"},{"id":"85249361-5580-4988-b7f0-3d7cea277223","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","taskId":"cca9d63e-6d57-4521-9bc5-b21c10867a9f","naam":"Druktest uitgevoerd vóór dichtbouwen","type":"CONTROLE","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.afpersen","templateVersion":2,"ruleId":"gen.gate.afpersen","createdAt":"2026-07-12T16:49:35.001Z"},{"id":"32c7b390-0767-4894-90ec-0594917c9659","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","taskId":"7be9cca1-e1ed-4168-a1b6-10f2fbe83f99","naam":"Weerstandsmeting vloerverwarming vastgelegd","type":"CONTROLE","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.vloerverwarming","templateVersion":2,"ruleId":"gen.gate.vloerverwarming","createdAt":"2026-07-12T16:49:35.006Z"},{"id":"f306b746-0884-40c2-b03f-d2f065019cf6","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","taskId":"ed9f5040-1645-49cf-ad54-ddc7bccfde10","naam":"Vrijgave dichtbouwen: alles gecontroleerd en vastgelegd","type":"CONTROLE","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.dichtbouw","templateVersion":4,"ruleId":"gen.gate.dichtbouw","createdAt":"2026-07-12T21:49:08.319Z"}],"changeRequests":[{"id":"1788b8c6-a2ae-48e5-beb9-ec7014df2680","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","type":"TEMPLATE_MIGRATIE","status":"BEVESTIGD","payload":{"naarTemplateVersionId":"d9bc7ae9-808d-404e-bb7d-6c0c56acc45a"},"diff":{"isLeeg":false,"vanVersie":1,"naarVersie":2,"nieuweTaken":[{"naam":"Vergunningcheck doen","nodeKey":"task.vergunningcheck","duurWerkdagen":1},{"naam":"VvE-toestemming regelen (bij appartement)","nodeKey":"task.vve","duurWerkdagen":1},{"naam":"Asbestcheck (woning van vóór 1994)","nodeKey":"task.asbestcheck","duurWerkdagen":1},{"naam":"Verbouwing melden bij opstalverzekering","nodeKey":"task.verzekering","duurWerkdagen":1},{"naam":"Offertes vergelijken en afspraken vastleggen","nodeKey":"task.offertes","duurWerkdagen":3},{"naam":"Meten of alles door de deur en het trapgat past","nodeKey":"task.doorgang","duurWerkdagen":1},{"naam":"Nulmeting: foto's van de bestaande situatie","nodeKey":"task.nulmeting","duurWerkdagen":1},{"naam":"Hoogtes en posities aftekenen en samen nalopen","nodeKey":"task.hoogtes","duurWerkdagen":1},{"naam":"Mechanische ventilatie aanleggen of verbeteren","nodeKey":"task.ventilatie","duurWerkdagen":1},{"naam":"Plafond stuken of spuiten","nodeKey":"task.plafond","duurWerkdagen":1},{"naam":"Maatwerk douchewand: inmeten, levertijd en plaatsen","nodeKey":"task.glas","duurWerkdagen":10},{"naam":"Bouwvocht wegventileren","nodeKey":"task.ventileren","duurWerkdagen":5},{"naam":"Nazorgmoment: kit, voegen en vloerverwarming nalopen","nodeKey":"task.nazorg","duurWerkdagen":1}],"vervallenTaken":[],"gewijzigdeTaken":[{"naam":"Oude badkamer slopen en afvoeren","nodeKey":"task.slopen","oudeDuur":3,"nieuweDuur":2},{"naam":"Wand- en vloertegels zetten","nodeKey":"task.tegelen","oudeDuur":6,"nieuweDuur":4}],"nieuweBeslissingen":[{"naam":"Kleur voegen en kit kiezen","nodeKey":"dec.voegkleur"}],"nieuweDependencies":["task.asbestcheck->task.slopen","task.doorgang->task.slopen","task.glas->task.oplevering","task.hoogtes->task.elektra","task.hoogtes->task.leidingwerk","task.nulmeting->task.slopen","task.offertes->task.beschermen","task.oplevering->task.ventileren","task.plafond->task.tegelen","task.slopen->task.hoogtes","task.slopen->task.ventilatie","task.smeren->task.plafond","task.ventilatie->task.smeren","task.ventileren->task.nazorg","task.vergunningcheck->task.slopen","task.verzekering->task.slopen","task.voegen->task.glas","task.vve->task.slopen"],"vervallenBeslissingen":[],"vervallenDependencies":["task.slopen->task.elektra","task.slopen->task.leidingwerk"]},"aangemaaktDoorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","bevestigdOp":"2026-07-12T16:49:35.140Z","createdAt":"2026-07-12T16:49:35.144Z"},{"id":"6819d5c5-93a3-4e70-ae0f-1fa6dc46df5d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","type":"TEMPLATE_MIGRATIE","status":"BEVESTIGD","payload":{"naarTemplateVersionId":"94926306-076a-43ca-966c-5a67b42db08a"},"diff":{"isLeeg":false,"vanVersie":2,"naarVersie":3,"nieuweTaken":[{"naam":"Ontwerp en definitieve indeling maken","nodeKey":"task.ontwerp","duurWerkdagen":5},{"naam":"Sanitair, tegels en inbouwdelen bestellen","nodeKey":"task.bestellen","duurWerkdagen":1},{"naam":"Wachten op leveringen en controleren bij ontvangst","nodeKey":"task.leveringen","duurWerkdagen":15},{"naam":"Droogtijd dekvloer en egaline (niets forceren)","nodeKey":"task.droogtijd","duurWerkdagen":3}],"vervallenTaken":[],"gewijzigdeTaken":[{"naam":"Offertes aanvragen, vergelijken en opdracht geven","nodeKey":"task.offertes","oudeDuur":3,"nieuweDuur":10}],"nieuweBeslissingen":[],"nieuweDependencies":["task.bestellen->task.leveringen","task.droogtijd->task.waterdicht","task.leveringen->task.slopen","task.offertes->task.bestellen","task.ontwerp->task.bestellen","task.ontwerp->task.offertes","task.smeren->task.droogtijd"],"vervallenBeslissingen":[],"vervallenDependencies":["task.smeren->task.waterdicht"]},"aangemaaktDoorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","bevestigdOp":"2026-07-12T17:19:54.872Z","createdAt":"2026-07-12T17:19:54.875Z"},{"id":"b78624c7-eaf8-4a4e-9f75-28691dee1192","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","type":"TEMPLATE_MIGRATIE","status":"BEVESTIGD","payload":{"naarTemplateVersionId":"e26b2a42-fd21-4f05-b47f-19729f0344ae"},"diff":{"isLeeg":false,"vanVersie":3,"naarVersie":4,"nieuweTaken":[{"naam":"Projectmap aanmaken en alles vastleggen","nodeKey":"task.dossier","duurWerkdagen":1},{"naam":"Laatste controle vóór dichtbouwen (onomkeerbaar werk)","nodeKey":"task.dichtbouw","duurWerkdagen":1},{"naam":"Waterproef: douche, afvoeren en aansluitingen testen","nodeKey":"task.watertest","duurWerkdagen":1}],"vervallenTaken":[],"gewijzigdeTaken":[],"nieuweBeslissingen":[],"nieuweDependencies":["task.afpersen->task.dichtbouw","task.dichtbouw->task.smeren","task.dossier->task.bestellen","task.elektra->task.dichtbouw","task.sanitair->task.watertest","task.ventilatie->task.dichtbouw","task.vloerverwarming->task.dichtbouw","task.watertest->task.oplevering"],"vervallenBeslissingen":[],"vervallenDependencies":["task.afpersen->task.smeren","task.elektra->task.smeren","task.sanitair->task.oplevering","task.ventilatie->task.smeren","task.vloerverwarming->task.smeren"]},"aangemaaktDoorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","bevestigdOp":"2026-07-12T21:49:08.369Z","createdAt":"2026-07-12T21:49:08.371Z"}],"auditEvents":[{"id":"f34a95f9-215b-4a68-b992-00cf3907582b","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.sloop","ruleId":"gen.scope.sloop","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.sloop"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.284Z"},{"id":"4c5c63be-98ce-4a05-9471-fa43775b1808","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.leidingwerk","ruleId":"gen.scope.leidingwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.leidingwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.288Z"},{"id":"013c5ae6-3ea8-4f0f-9d05-9f52fb0462ff","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.elektra","ruleId":"gen.scope.elektra","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.elektra"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.290Z"},{"id":"7afa2102-89d6-4b0b-9f1e-af890162af36","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.vloerverwarming","ruleId":"gen.scope.vloerverwarming","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"OPTIONEEL","conditie":{"optie":"vloerverwarming"}},"type":"SCOPE_ITEM","nodeKey":"scope.vloerverwarming"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.292Z"},{"id":"31d2cd65-466f-458c-995f-d5b188acb35f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.tegelwerk","ruleId":"gen.scope.tegelwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.tegelwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.294Z"},{"id":"000dfd35-4a5a-48cb-9e21-5d772b4051bf","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.sanitair","ruleId":"gen.scope.sanitair","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.sanitair"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.298Z"},{"id":"a83b60f6-0ac4-4a05-bbe7-75f52cf40b5f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.afwerking","ruleId":"gen.scope.afwerking","templateVersion":1,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.afwerking"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.300Z"},{"id":"2b92db38-e8e6-4e54-9ee5-87fffbe917a0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.regelwerk","ruleId":"gen.wp.regelwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"vakgebied":"algemeen","omschrijving":"Alles wat geregeld moet zijn vóór de eerste hamerslag."},"type":"WORKPACKAGE","nodeKey":"wp.regelwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.302Z"},{"id":"00a1dc2c-b361-4fe2-bd8f-da3635c23d01","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.buren","ruleId":"gen.task.buren","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Meld sloopdata en geef je telefoonnummer — voorkomt klachten en handhaving. Geluid mag doorgaans ma–za 07:00–19:00.","uitleg":"Aannemers doen dit standaard; particulieren vergeten het en beginnen met een burenconflict.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.buren"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.306Z"},{"id":"1ece820a-192c-4631-8f8f-d39a238d4144","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.container","ruleId":"gen.task.container","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Container op de openbare weg vereist vaak een gemeentelijke vergunning (precario) — regel die minimaal een week vooraf.","uitleg":"Zonder afvoer ligt het puin dagen in je gang. Gips en puin gescheiden afvoeren is goedkoper.","vakgebied":"algemeen","kostenCents":45000,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.container"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.308Z"},{"id":"961d1f7a-796d-4fc6-8c45-8018707f55b4","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.tijdelijk","ruleId":"gen.task.tijdelijk","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Je badkamer is 2–4 weken buiten gebruik. Regel douchen (sportschool, buren, familie) vóór de sloop, niet erna.","uitleg":"De meest onderschatte praktische kant van een badkamerverbouwing.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.tijdelijk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.311Z"},{"id":"1ba6d047-83dd-490e-b6a4-cfd93b9ae898","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.voorbereiding","ruleId":"gen.wp.voorbereiding","templateVersion":1,"inputSnapshot":{"node":{"data":{"vakgebied":"sloop","omschrijving":"Beschermen, afkoppelen en slopen van de oude badkamer."},"type":"WORKPACKAGE","nodeKey":"wp.voorbereiding"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.313Z"},{"id":"4d643bc6-5c6b-4011-80bf-fa1832dcfc1e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.beschermen","ruleId":"gen.task.beschermen","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Dek ook de trap en looproutes af en plak mechanische ventilatie af tegen bouwstof.","vakgebied":"algemeen","kostenCents":15000,"classificatie":"VRIJ","duurWerkdagen":1},"type":"TASK","nodeKey":"task.beschermen"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.314Z"},{"id":"98f79bf2-272a-43b3-8d7b-b6a37afadc6a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.afkoppelen","ruleId":"gen.task.afkoppelen","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Regel een bouwlamp en verlenghaspel op een andere groep — na afkoppelen is er geen licht meer in de ruimte.","uitleg":"Veel mensen vergeten afkoppelen te plannen vóór sloop — anders loop je vertraging op.","vakgebied":"installatie","kostenCents":25000,"classificatie":"SPECIALIST","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.afkoppelen"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.316Z"},{"id":"6a43c465-4ad8-4f31-a921-bc6fa09746c5","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.slopen","ruleId":"gen.task.slopen","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Woning van vóór 1994? Laat eerst op asbest checken (zeil, lijmlagen, standleiding). Reserveer 10–15% budget voor verborgen gebreken achter de tegels.","vakgebied":"sloop","kostenCents":80000,"classificatie":"CONTROLE_AANBEVOLEN","duurWerkdagen":2},"type":"TASK","nodeKey":"task.slopen"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.318Z"},{"id":"1c8e429e-666c-4716-98cc-504757ba2e08","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.installaties","ruleId":"gen.wp.installaties","templateVersion":1,"inputSnapshot":{"node":{"data":{"vakgebied":"installatie","omschrijving":"Nieuw leidingwerk, afvoeren en elektra."},"type":"WORKPACKAGE","nodeKey":"wp.installaties"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.320Z"},{"id":"7db2d0b0-cf2e-444b-8b6e-1d0b9535e841","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.leidingwerk","ruleId":"gen.task.leidingwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Maak foto's van leidingwerk vóór dichtsmeren — je kunt het daarna niet meer controleren. Let op afschot: minimaal 5 mm per meter naar de afvoer.","uitleg":"Dichtbouwalarm: leidingwerk moet vastgelegd zijn vóór afbouw.","vakgebied":"installatie","kostenCents":180000,"materialKeys":["mat.leidingwerk"],"classificatie":"SPECIALIST","duurWerkdagen":3,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.leidingwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.322Z"},{"id":"e99b796b-7ed0-4b0d-a17c-1c34a7f6ff74","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.afpersen","ruleId":"gen.task.afpersen","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Test de waterleidingen onder druk vóórdat de vloer en wanden dichtgaan. Lekkage achteraf betekent: tegels eruit.","uitleg":"Standaardstap voor elke installateur, vrijwel altijd overgeslagen door zelfverbouwers.","vakgebied":"installatie","kostenCents":10000,"classificatie":"SPECIALIST","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.afpersen"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.324Z"},{"id":"4bb87669-ab84-4c64-9fb4-9482184dcbf9","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.elektra","ruleId":"gen.task.elektra","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Badkamer vereist NEN 1010: aparte groep, 30mA-aardlek en aarding van leidingen. Laat het keuren — verzekeraars vragen erom bij schade. Trek meteen een loze leiding extra voor later.","vakgebied":"elektra","kostenCents":140000,"classificatie":"VERPLICHT_GEKWALIFICEERD","duurWerkdagen":2},"type":"TASK","nodeKey":"task.elektra"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.326Z"},{"id":"8a401531-b257-4154-b319-6013abebffbc","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vloerverwarming","ruleId":"gen.task.vloerverwarming","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Meet de weerstand van de mat vóór het leggen, ná het leggen én na het tegelen — garantievoorwaarde van fabrikanten.","conditie":{"optie":"vloerverwarming"},"vakgebied":"installatie","kostenCents":90000,"decisionKeys":["dec.vloerverwarming"],"materialKeys":["mat.vloerverwarming"],"classificatie":"CONTROLE_AANBEVOLEN","duurWerkdagen":1},"type":"TASK","nodeKey":"task.vloerverwarming"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.328Z"},{"id":"c4dbecb2-f409-4021-8934-c0d93ea8fc29","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.afbouw","ruleId":"gen.wp.afbouw","templateVersion":1,"inputSnapshot":{"node":{"data":{"vakgebied":"tegelzetten","omschrijving":"Smeren, tegelen en voegen."},"type":"WORKPACKAGE","nodeKey":"wp.afbouw"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.329Z"},{"id":"8741ae26-6c50-442e-8dc3-c3d1fa520011","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.smeren","ruleId":"gen.task.smeren","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Droogtijden zijn niet onderhandelbaar: egaline 24–48 uur. Grootformaat tegels eisen vlakheid van ±2 mm per 2 meter.","vakgebied":"afbouw","kostenCents":60000,"classificatie":"CONTROLE_AANBEVOLEN","duurWerkdagen":2},"type":"TASK","nodeKey":"task.smeren"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.331Z"},{"id":"acc23016-aa80-420b-a11b-85b414712cb0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.waterdicht","ruleId":"gen.task.waterdicht","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Plan kimband en smeerbare waterdichting apart in — dé meest vergeten stap tussen smeren en tegelen.","uitleg":"Waterdichting is verplicht in natte zones vóór tegelwerk.","vakgebied":"afbouw","kostenCents":35000,"classificatie":"SPECIALIST","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.waterdicht"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.333Z"},{"id":"a933da7e-563f-4f34-91dc-0defb939ec26","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.tegelen","ruleId":"gen.task.tegelen","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Bevestig startpunt en tegelpatroon vóór de eerste tegel. Mix tegels uit verschillende dozen tegen kleurbanen en bewaar één doos reserve.","vakgebied":"tegelzetten","kostenCents":380000,"decisionKeys":["dec.tegels"],"materialKeys":["mat.tegels"],"classificatie":"SPECIALIST","duurWerkdagen":4},"type":"TASK","nodeKey":"task.tegelen"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.334Z"},{"id":"a545c86e-b08e-449d-8174-66df5567bdc9","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.voegen","ruleId":"gen.task.voegen","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Hoeken en overgangen krijgen kit, geen voeg — anders scheurt het. Kit 24–48 uur niet nat maken.","vakgebied":"tegelzetten","kostenCents":60000,"classificatie":"CONTROLE_AANBEVOLEN","duurWerkdagen":1},"type":"TASK","nodeKey":"task.voegen"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.336Z"},{"id":"2bd3b90b-3834-4a7d-8ab9-b998dece3aeb","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.sanitair","ruleId":"gen.wp.sanitair","templateVersion":1,"inputSnapshot":{"node":{"data":{"vakgebied":"installatie","omschrijving":"Plaatsen van sanitair en afwerking."},"type":"WORKPACKAGE","nodeKey":"wp.sanitair"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.339Z"},{"id":"b7cece4e-2c36-44da-ab14-d94d426fd6e6","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.sanitair","ruleId":"gen.task.sanitair","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Controleer sifons en flexibele slangen de eerste week dagelijks op lekkage. Maatwerk douchewand kan pas ná het tegelen worden ingemeten (2–4 weken levertijd).","vakgebied":"installatie","kostenCents":320000,"decisionKeys":["dec.sanitair"],"materialKeys":["mat.sanitair"],"classificatie":"SPECIALIST","duurWerkdagen":2},"type":"TASK","nodeKey":"task.sanitair"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.342Z"},{"id":"a62875da-7d45-468e-8755-57c591b62171","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.afmonteren","ruleId":"gen.task.afmonteren","templateVersion":1,"inputSnapshot":{"node":{"data":{"vakgebied":"elektra","kostenCents":60000,"classificatie":"VERPLICHT_GEKWALIFICEERD","duurWerkdagen":1},"type":"TASK","nodeKey":"task.afmonteren"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.344Z"},{"id":"ad179334-38cc-43a7-af82-4fbaa20ff83c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.oplevering","ruleId":"gen.task.oplevering","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Loop alles samen na en leg restpunten schriftelijk vast met deadline. Vraag garantiebewijzen en het keuringsrapport van de elektra op. Blijf weken goed ventileren tegen bouwvocht.","vakgebied":"algemeen","kostenCents":10000,"classificatie":"VRIJ","duurWerkdagen":1},"type":"TASK","nodeKey":"task.oplevering"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.347Z"},{"id":"5e43ee6a-d8f2-426c-99ee-858225f5f786","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"beslissing_gegenereerd","entiteitType":"TemplateNode","entiteitId":"dec.tegels","ruleId":"gen.dec.tegels","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Kies antislipklasse vóór bestellen — retour tegels is duur.","omschrijving":"Formaat, kleur en antislipklasse bepalen mede het tegelwerk.","bufferWerkdagen":3},"type":"DECISION","nodeKey":"dec.tegels"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.349Z"},{"id":"8cdabe31-134a-47ec-b20d-8221b9cfd561","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"beslissing_gegenereerd","entiteitType":"TemplateNode","entiteitId":"dec.sanitair","ruleId":"gen.dec.sanitair","templateVersion":1,"inputSnapshot":{"node":{"data":{"tip":"Inbouwkranen en reservoir moeten fysiek in huis zijn vóór de loodgieter het ruwe leidingwerk maakt.","omschrijving":"Douche(set), wastafelmeubel, toilet en kranen.","bufferWerkdagen":3},"type":"DECISION","nodeKey":"dec.sanitair"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.351Z"},{"id":"4025243c-0d06-4971-a1e1-cdb1f5bba0b0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"beslissing_gegenereerd","entiteitType":"TemplateNode","entiteitId":"dec.vloerverwarming","ruleId":"gen.dec.vloerverwarming","templateVersion":1,"inputSnapshot":{"node":{"data":{"conditie":{"optie":"vloerverwarming"},"omschrijving":"Bepaalt opbouwhoogte en elektrawerk.","bufferWerkdagen":2},"type":"DECISION","nodeKey":"dec.vloerverwarming"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.353Z"},{"id":"80132bfe-6d2f-4323-98c9-ca1015571007","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"materiaal_gegenereerd","entiteitType":"TemplateNode","entiteitId":"mat.tegels","ruleId":"gen.mat.tegels","templateVersion":1,"inputSnapshot":{"node":{"data":{"decisionKey":"dec.tegels","levertijdWerkdagen":10},"type":"MATERIAL","nodeKey":"mat.tegels"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.355Z"},{"id":"98ec10a9-5b93-4cfa-80fd-46f188dbfede","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"materiaal_gegenereerd","entiteitType":"TemplateNode","entiteitId":"mat.sanitair","ruleId":"gen.mat.sanitair","templateVersion":1,"inputSnapshot":{"node":{"data":{"decisionKey":"dec.sanitair","levertijdWerkdagen":15},"type":"MATERIAL","nodeKey":"mat.sanitair"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.356Z"},{"id":"40f7436f-2f73-423b-a91e-b08a1750250d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"materiaal_gegenereerd","entiteitType":"TemplateNode","entiteitId":"mat.leidingwerk","ruleId":"gen.mat.leidingwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"levertijdWerkdagen":3},"type":"MATERIAL","nodeKey":"mat.leidingwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.358Z"},{"id":"300a6086-670a-42d4-8037-5c5a1957d69d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"materiaal_gegenereerd","entiteitType":"TemplateNode","entiteitId":"mat.vloerverwarming","ruleId":"gen.mat.vloerverwarming","templateVersion":1,"inputSnapshot":{"node":{"data":{"conditie":{"optie":"vloerverwarming"},"decisionKey":"dec.vloerverwarming","levertijdWerkdagen":5},"type":"MATERIAL","nodeKey":"mat.vloerverwarming"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.366Z"},{"id":"b6633301-2cff-4c89-9e45-427b3377a5bd","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.leidingwerk","ruleId":"gen.gate.leidingwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"taskKey":"task.leidingwerk","gateType":"FOTO"},"type":"QUALITY_GATE","nodeKey":"gate.leidingwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.369Z"},{"id":"0d47b4ae-7462-469b-802e-18afeb7f259f","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.elektra","ruleId":"gen.gate.elektra","templateVersion":1,"inputSnapshot":{"node":{"data":{"taskKey":"task.elektra","gateType":"GEKWALIFICEERD_BEWIJS"},"type":"QUALITY_GATE","nodeKey":"gate.elektra"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.371Z"},{"id":"69e25b8b-7ae5-43ba-b907-9b7d7418b00d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.waterdicht","ruleId":"gen.gate.waterdicht","templateVersion":1,"inputSnapshot":{"node":{"data":{"taskKey":"task.waterdicht","gateType":"CONTROLE"},"type":"QUALITY_GATE","nodeKey":"gate.waterdicht"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.373Z"},{"id":"776fdf91-6a26-4150-9481-e442ebafe175","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.sloop","ruleId":"gen.budget.sloop","templateVersion":1,"inputSnapshot":{"node":{"data":{"bedragCents":120000,"scopeItemKey":"scope.sloop"},"type":"BUDGET_ITEM","nodeKey":"budget.sloop"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.375Z"},{"id":"41a69819-c548-4a09-8e0e-000c8a0c65ad","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.installaties","ruleId":"gen.budget.installaties","templateVersion":1,"inputSnapshot":{"node":{"data":{"bedragCents":380000,"scopeItemKey":"scope.leidingwerk"},"type":"BUDGET_ITEM","nodeKey":"budget.installaties"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.379Z"},{"id":"2548ea48-67b0-481d-a391-bb4042fec36b","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.vloerverwarming","ruleId":"gen.budget.vloerverwarming","templateVersion":1,"inputSnapshot":{"node":{"data":{"conditie":{"optie":"vloerverwarming"},"bedragCents":90000,"scopeItemKey":"scope.vloerverwarming"},"type":"BUDGET_ITEM","nodeKey":"budget.vloerverwarming"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.381Z"},{"id":"4c645142-bede-4ae1-a791-9596ffdcb3e1","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.tegelwerk","ruleId":"gen.budget.tegelwerk","templateVersion":1,"inputSnapshot":{"node":{"data":{"bedragCents":550000,"scopeItemKey":"scope.tegelwerk"},"type":"BUDGET_ITEM","nodeKey":"budget.tegelwerk"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.383Z"},{"id":"518fd46b-24ad-49a9-bfb9-8e212df572ed","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.sanitair","ruleId":"gen.budget.sanitair","templateVersion":1,"inputSnapshot":{"node":{"data":{"bedragCents":420000,"scopeItemKey":"scope.sanitair"},"type":"BUDGET_ITEM","nodeKey":"budget.sanitair"},"params":{"opties":{"vloerverwarming":true},"projectType":"BADKAMER","gewensteStart":"2026-09-07","budgetMaxCents":1800000,"budgetMinCents":1200000,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T15:57:32.386Z"},{"id":"e84112d6-f144-4e03-b050-beec940d4042","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.afkoppelen->task.slopen","ruleId":"gen.dep.task.afkoppelen->task.slopen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.slopen","predecessorKey":"task.afkoppelen"}},"data":null,"createdAt":"2026-07-12T15:57:32.388Z"},{"id":"ffb19627-094a-4b5e-8a17-e43c228541e3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.afmonteren->task.oplevering","ruleId":"gen.dep.task.afmonteren->task.oplevering","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.oplevering","predecessorKey":"task.afmonteren"}},"data":null,"createdAt":"2026-07-12T15:57:32.390Z"},{"id":"41385c24-bcff-4713-9052-de17a63d337d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.afpersen->task.smeren","ruleId":"gen.dep.task.afpersen->task.smeren","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.smeren","predecessorKey":"task.afpersen"}},"data":null,"createdAt":"2026-07-12T15:57:32.392Z"},{"id":"393d1fa3-cd29-4eab-9ff8-71ca1e12de08","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.beschermen->task.afkoppelen","ruleId":"gen.dep.task.beschermen->task.afkoppelen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.afkoppelen","predecessorKey":"task.beschermen"}},"data":null,"createdAt":"2026-07-12T15:57:32.393Z"},{"id":"0245a357-62e4-4226-baf3-67e205a3bd60","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.buren->task.slopen","ruleId":"gen.dep.task.buren->task.slopen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.slopen","predecessorKey":"task.buren"}},"data":null,"createdAt":"2026-07-12T15:57:32.395Z"},{"id":"dc177330-43b1-4ba0-b4c4-4aac0e3c20bb","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.container->task.slopen","ruleId":"gen.dep.task.container->task.slopen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.slopen","predecessorKey":"task.container"}},"data":null,"createdAt":"2026-07-12T15:57:32.397Z"},{"id":"4d67e6d1-c305-4ccb-be85-9fc78cb047a0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.elektra->task.smeren","ruleId":"gen.dep.task.elektra->task.smeren","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.smeren","predecessorKey":"task.elektra"}},"data":null,"createdAt":"2026-07-12T15:57:32.398Z"},{"id":"77faf3d7-f041-4a2d-8a21-8a6db5475501","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.leidingwerk->task.afpersen","ruleId":"gen.dep.task.leidingwerk->task.afpersen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.afpersen","predecessorKey":"task.leidingwerk"}},"data":null,"createdAt":"2026-07-12T15:57:32.400Z"},{"id":"ba78d319-b424-4d88-b9b2-142ca52af12e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.leidingwerk->task.vloerverwarming","ruleId":"gen.dep.task.leidingwerk->task.vloerverwarming","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.vloerverwarming","predecessorKey":"task.leidingwerk"}},"data":null,"createdAt":"2026-07-12T15:57:32.402Z"},{"id":"5ed9724c-90ee-45c4-a8e8-07df315a206d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.sanitair->task.oplevering","ruleId":"gen.dep.task.sanitair->task.oplevering","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.oplevering","predecessorKey":"task.sanitair"}},"data":null,"createdAt":"2026-07-12T15:57:32.403Z"},{"id":"e85e2cf5-698e-4350-9fe3-73dbed9fb8de","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.slopen->task.elektra","ruleId":"gen.dep.task.slopen->task.elektra","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.elektra","predecessorKey":"task.slopen"}},"data":null,"createdAt":"2026-07-12T15:57:32.405Z"},{"id":"4e623712-8b66-4d57-8501-e14f95cce6f0","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.slopen->task.leidingwerk","ruleId":"gen.dep.task.slopen->task.leidingwerk","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.leidingwerk","predecessorKey":"task.slopen"}},"data":null,"createdAt":"2026-07-12T15:57:32.406Z"},{"id":"5232fe5d-c387-40d4-97e2-5870d12f0cfe","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.smeren->task.waterdicht","ruleId":"gen.dep.task.smeren->task.waterdicht","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.waterdicht","predecessorKey":"task.smeren"}},"data":null,"createdAt":"2026-07-12T15:57:32.408Z"},{"id":"ffa1f89e-53fb-4450-a360-d8d56aa470b3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.tegelen->task.voegen","ruleId":"gen.dep.task.tegelen->task.voegen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.voegen","predecessorKey":"task.tegelen"}},"data":null,"createdAt":"2026-07-12T15:57:32.410Z"},{"id":"bb794987-39f7-4060-ada9-5887ed1e3f5c","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.tijdelijk->task.afkoppelen","ruleId":"gen.dep.task.tijdelijk->task.afkoppelen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.afkoppelen","predecessorKey":"task.tijdelijk"}},"data":null,"createdAt":"2026-07-12T15:57:32.413Z"},{"id":"33b2aeee-3d74-4b5b-9d76-d7283b1d6377","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vloerverwarming->task.smeren","ruleId":"gen.dep.task.vloerverwarming->task.smeren","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.smeren","predecessorKey":"task.vloerverwarming"}},"data":null,"createdAt":"2026-07-12T15:57:32.415Z"},{"id":"193dc411-a9ef-4414-a4e6-a7974626f092","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.voegen->task.afmonteren","ruleId":"gen.dep.task.voegen->task.afmonteren","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.afmonteren","predecessorKey":"task.voegen"}},"data":null,"createdAt":"2026-07-12T15:57:32.417Z"},{"id":"48941acb-47b0-45aa-9d35-b00b74cccae3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.voegen->task.sanitair","ruleId":"gen.dep.task.voegen->task.sanitair","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.sanitair","predecessorKey":"task.voegen"}},"data":null,"createdAt":"2026-07-12T15:57:32.418Z"},{"id":"235001eb-c239-486e-b007-bb0f417fb497","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.waterdicht->task.tegelen","ruleId":"gen.dep.task.waterdicht->task.tegelen","templateVersion":1,"inputSnapshot":{"dep":{"successorKey":"task.tegelen","predecessorKey":"task.waterdicht"}},"data":null,"createdAt":"2026-07-12T15:57:32.420Z"},{"id":"2806f7c9-31bb-4cc2-939b-bc37df49d379","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"SYSTEEM","actorId":null,"actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"initiele_generatie"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T15:57:32.591Z"},{"id":"1e726397-5ae5-4b9f-83e6-bc5dc28df431","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"correctie_duur_aangepast","entiteitType":"Task","entiteitId":"80799494-27f5-4fbd-9edb-f32743d49f33","ruleId":"gen.task.tegelen","templateVersion":1,"inputSnapshot":null,"data":{"reden":{"tekst":"Groot formaat tegels en veel zaagwerk; 4 dagen is structureel te krap.","categorie":"INSCHATTING_TE_LAAG"},"payload":{"type":"DUUR_AANGEPAST","taskId":"80799494-27f5-4fbd-9edb-f32743d49f33","nieuweDuurWerkdagen":6}},"createdAt":"2026-07-12T15:57:32.611Z"},{"id":"1222a9fa-c85f-48e0-9658-7a4b3fd69a7a","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"correctie_duur_aangepast"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T15:57:32.689Z"},{"id":"670116da-5d88-4fc8-b12e-38e025e0fbbe","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"correctie_duur_aangepast","entiteitType":"Task","entiteitId":"12cfcf99-a6ad-4899-a105-b4606765f714","ruleId":"gen.task.slopen","templateVersion":1,"inputSnapshot":null,"data":{"reden":{"tekst":"Extra dag door betonnen douchebak uit de jaren 70.","categorie":"PROJECTSPECIFIEK"},"payload":{"type":"DUUR_AANGEPAST","taskId":"12cfcf99-a6ad-4899-a105-b4606765f714","nieuweDuurWerkdagen":3}},"createdAt":"2026-07-12T15:57:32.701Z"},{"id":"57aa4fa5-214f-4339-88b4-9a9cc6299e21","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"correctie_duur_aangepast"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T15:57:32.803Z"},{"id":"bfbd97b1-ac7e-4654-ab15-a9f1df007195","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"correctie_beslisdatum_aangepast","entiteitType":"Decision","entiteitId":"c72cb1a7-1112-46a7-a909-c236d8fa2428","ruleId":"gen.dec.sanitair","templateVersion":1,"inputSnapshot":null,"data":{"reden":{"tekst":"Leverancier hanteert momenteel 4 weken levertijd i.p.v. 3.","categorie":"LEVERANCIERSPROBLEEM"},"payload":{"type":"BESLISDATUM_AANGEPAST","decisionId":"c72cb1a7-1112-46a7-a909-c236d8fa2428","nieuweDatum":"2026-08-14"}},"createdAt":"2026-07-12T15:57:32.821Z"},{"id":"d0fd0b1a-6e25-4684-9869-0044d21abaff","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"correctie_beslisdatum_aangepast"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T15:57:32.911Z"},{"id":"bb972b27-1ca4-4208-bfcd-22ac98f3d656","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T16:01:25.722Z"},{"id":"0c90cda2-7528-4f74-9a22-9ac7c34ffca4","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T16:01:25.731Z"},{"id":"40e95260-6d43-4b77-9d29-30b5b556f1b5","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T16:13:59.670Z"},{"id":"0853e79a-8db2-4df4-b5dd-81044e40dc7e","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"template_migratie","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"migratie.template","templateVersion":2,"inputSnapshot":{"naarTemplateVersionId":"d9bc7ae9-808d-404e-bb7d-6c0c56acc45a"},"data":{"isLeeg":false,"vanVersie":1,"naarVersie":2,"nieuweTaken":[{"naam":"Vergunningcheck doen","nodeKey":"task.vergunningcheck","duurWerkdagen":1},{"naam":"VvE-toestemming regelen (bij appartement)","nodeKey":"task.vve","duurWerkdagen":1},{"naam":"Asbestcheck (woning van vóór 1994)","nodeKey":"task.asbestcheck","duurWerkdagen":1},{"naam":"Verbouwing melden bij opstalverzekering","nodeKey":"task.verzekering","duurWerkdagen":1},{"naam":"Offertes vergelijken en afspraken vastleggen","nodeKey":"task.offertes","duurWerkdagen":3},{"naam":"Meten of alles door de deur en het trapgat past","nodeKey":"task.doorgang","duurWerkdagen":1},{"naam":"Nulmeting: foto's van de bestaande situatie","nodeKey":"task.nulmeting","duurWerkdagen":1},{"naam":"Hoogtes en posities aftekenen en samen nalopen","nodeKey":"task.hoogtes","duurWerkdagen":1},{"naam":"Mechanische ventilatie aanleggen of verbeteren","nodeKey":"task.ventilatie","duurWerkdagen":1},{"naam":"Plafond stuken of spuiten","nodeKey":"task.plafond","duurWerkdagen":1},{"naam":"Maatwerk douchewand: inmeten, levertijd en plaatsen","nodeKey":"task.glas","duurWerkdagen":10},{"naam":"Bouwvocht wegventileren","nodeKey":"task.ventileren","duurWerkdagen":5},{"naam":"Nazorgmoment: kit, voegen en vloerverwarming nalopen","nodeKey":"task.nazorg","duurWerkdagen":1}],"vervallenTaken":[],"gewijzigdeTaken":[{"naam":"Oude badkamer slopen en afvoeren","nodeKey":"task.slopen","oudeDuur":3,"nieuweDuur":2},{"naam":"Wand- en vloertegels zetten","nodeKey":"task.tegelen","oudeDuur":6,"nieuweDuur":4}],"nieuweBeslissingen":[{"naam":"Kleur voegen en kit kiezen","nodeKey":"dec.voegkleur"}],"nieuweDependencies":["task.asbestcheck->task.slopen","task.doorgang->task.slopen","task.glas->task.oplevering","task.hoogtes->task.elektra","task.hoogtes->task.leidingwerk","task.nulmeting->task.slopen","task.offertes->task.beschermen","task.oplevering->task.ventileren","task.plafond->task.tegelen","task.slopen->task.hoogtes","task.slopen->task.ventilatie","task.smeren->task.plafond","task.ventilatie->task.smeren","task.ventileren->task.nazorg","task.vergunningcheck->task.slopen","task.verzekering->task.slopen","task.voegen->task.glas","task.vve->task.slopen"],"vervallenBeslissingen":[],"vervallenDependencies":["task.slopen->task.elektra","task.slopen->task.leidingwerk"]},"createdAt":"2026-07-12T16:49:35.154Z"},{"id":"96b45604-677f-4423-8182-2dba5e3db719","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"template_migratie"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T16:49:35.463Z"},{"id":"8019901d-9707-4f9d-a403-a44853227818","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"template_migratie","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"migratie.template","templateVersion":3,"inputSnapshot":{"naarTemplateVersionId":"94926306-076a-43ca-966c-5a67b42db08a"},"data":{"isLeeg":false,"vanVersie":2,"naarVersie":3,"nieuweTaken":[{"naam":"Ontwerp en definitieve indeling maken","nodeKey":"task.ontwerp","duurWerkdagen":5},{"naam":"Sanitair, tegels en inbouwdelen bestellen","nodeKey":"task.bestellen","duurWerkdagen":1},{"naam":"Wachten op leveringen en controleren bij ontvangst","nodeKey":"task.leveringen","duurWerkdagen":15},{"naam":"Droogtijd dekvloer en egaline (niets forceren)","nodeKey":"task.droogtijd","duurWerkdagen":3}],"vervallenTaken":[],"gewijzigdeTaken":[{"naam":"Offertes aanvragen, vergelijken en opdracht geven","nodeKey":"task.offertes","oudeDuur":3,"nieuweDuur":10}],"nieuweBeslissingen":[],"nieuweDependencies":["task.bestellen->task.leveringen","task.droogtijd->task.waterdicht","task.leveringen->task.slopen","task.offertes->task.bestellen","task.ontwerp->task.bestellen","task.ontwerp->task.offertes","task.smeren->task.droogtijd"],"vervallenBeslissingen":[],"vervallenDependencies":["task.smeren->task.waterdicht"]},"createdAt":"2026-07-12T17:19:54.882Z"},{"id":"b4c60be5-9fdd-49e7-8fa6-146305df1b19","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"template_migratie"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T17:19:55.113Z"},{"id":"124942de-cb05-4310-82ef-a1311c001635","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T19:13:53.162Z"},{"id":"606bd6cd-fdf4-4718-a9f0-90a614c92fb8","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"ec5a5add-e3a7-43b7-ac03-f565464be0ef","ruleId":"gen.task.buren","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T20:36:28.419Z"},{"id":"cfd1df1c-99a9-4ed6-a054-fcf3ea437270","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_heropend","entiteitType":"Task","entiteitId":"ec5a5add-e3a7-43b7-ac03-f565464be0ef","ruleId":"gen.task.buren","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T20:36:29.462Z"},{"id":"4f75d03b-27d4-46b2-b52f-f19e58de971d","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"c7fa01fb-1e39-4f7b-881e-b857ff802473","ruleId":"gen.task.container","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T20:36:32.187Z"},{"id":"c8cc8696-33af-414c-9be3-cfed9a417464","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_heropend","entiteitType":"Task","entiteitId":"c7fa01fb-1e39-4f7b-881e-b857ff802473","ruleId":"gen.task.container","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T20:36:32.859Z"},{"id":"a6636724-480a-4b29-b9b8-3b856b509ad3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T20:45:14.088Z"},{"id":"886bff8c-3a5c-4d35-938e-9143f96c50de","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T20:45:17.556Z"},{"id":"82d4d640-a15b-437d-81da-6c4acd896f25","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T21:15:15.243Z"},{"id":"26b3126f-8582-44c4-a75a-d3e2e5927d86","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"d52889e1-cd51-40db-8e0d-146ee95aff75","ruleId":"gen.task.leidingwerk","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:38:22.337Z"},{"id":"5e584cdd-d4ba-4664-97a0-4f18454233ae","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_heropend","entiteitType":"Task","entiteitId":"d52889e1-cd51-40db-8e0d-146ee95aff75","ruleId":"gen.task.leidingwerk","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:38:23.138Z"},{"id":"92c00c92-5453-4f7b-b44f-a78fcb56fcb3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"c1b74356-0e89-479d-a205-2d308217de12","ruleId":"gen.task.hoogtes","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:38:24.200Z"},{"id":"e9de344a-e0a9-4857-8c4e-bd733d867bfd","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"d52889e1-cd51-40db-8e0d-146ee95aff75","ruleId":"gen.task.leidingwerk","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:38:25.212Z"},{"id":"3d018f04-7629-4e39-b2b4-b3002e286f59","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"49bb74d5-eb68-456f-ab17-f4c0cb193fff","ruleId":"gen.task.elektra","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:38:27.933Z"},{"id":"93d3d073-75f2-4599-b83f-ae89828879be","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_afgerond","entiteitType":"Task","entiteitId":"673bba14-68b3-4cd8-a36a-758d0842fadb","ruleId":"gen.task.ventilatie","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:38:32.482Z"},{"id":"65b07beb-ffd9-4d73-bd28-e04127266aa2","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"uitvoerder_gekozen","entiteitType":"Task","entiteitId":"c1b74356-0e89-479d-a205-2d308217de12","ruleId":"gen.task.hoogtes","templateVersion":3,"inputSnapshot":null,"data":{"bevestigd":false,"uitvoerder":"ZELF","classificatie":"VRIJ"},"createdAt":"2026-07-12T21:38:54.644Z"},{"id":"8ca4cabd-8740-4df2-91ee-659f345296ae","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_heropend","entiteitType":"Task","entiteitId":"d52889e1-cd51-40db-8e0d-146ee95aff75","ruleId":"gen.task.leidingwerk","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:39:11.413Z"},{"id":"2218614c-38e1-4b21-a9e5-060978592258","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"taak_heropend","entiteitType":"Task","entiteitId":"49bb74d5-eb68-456f-ab17-f4c0cb193fff","ruleId":"gen.task.elektra","templateVersion":3,"inputSnapshot":null,"data":{"via":"tijdlijn"},"createdAt":"2026-07-12T21:39:27.406Z"},{"id":"4e3614b4-a9cc-4070-8b29-a883a8c55dcd","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"template_migratie","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"migratie.template","templateVersion":4,"inputSnapshot":{"naarTemplateVersionId":"e26b2a42-fd21-4f05-b47f-19729f0344ae"},"data":{"isLeeg":false,"vanVersie":3,"naarVersie":4,"nieuweTaken":[{"naam":"Projectmap aanmaken en alles vastleggen","nodeKey":"task.dossier","duurWerkdagen":1},{"naam":"Laatste controle vóór dichtbouwen (onomkeerbaar werk)","nodeKey":"task.dichtbouw","duurWerkdagen":1},{"naam":"Waterproef: douche, afvoeren en aansluitingen testen","nodeKey":"task.watertest","duurWerkdagen":1}],"vervallenTaken":[],"gewijzigdeTaken":[],"nieuweBeslissingen":[],"nieuweDependencies":["task.afpersen->task.dichtbouw","task.dichtbouw->task.smeren","task.dossier->task.bestellen","task.elektra->task.dichtbouw","task.sanitair->task.watertest","task.ventilatie->task.dichtbouw","task.vloerverwarming->task.dichtbouw","task.watertest->task.oplevering"],"vervallenBeslissingen":[],"vervallenDependencies":["task.afpersen->task.smeren","task.elektra->task.smeren","task.sanitair->task.oplevering","task.ventilatie->task.smeren","task.vloerverwarming->task.smeren"]},"createdAt":"2026-07-12T21:49:08.374Z"},{"id":"347cd2ef-99ca-4106-89f0-37394a546705","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","actorType":"USER","actorId":"eccf8c7d-551a-457f-aa63-3219ed8f9435","actie":"planning_herberekend","entiteitType":"Project","entiteitId":"182f8563-312e-4ee3-86e1-27ec4662231f","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"template_migratie"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T21:49:08.488Z"}],"manualCorrections":[{"id":"e89076aa-c7fe-41ab-bbd3-d0a6be89d349","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","type":"DUUR_AANGEPAST","entiteitType":"Task","entiteitId":"80799494-27f5-4fbd-9edb-f32743d49f33","oldValue":{"duurWerkdagen":4},"newValue":{"duurWerkdagen":6},"redenCategorie":"INSCHATTING_TE_LAAG","redenTekst":"Groot formaat tegels en veel zaagwerk; 4 dagen is structureel te krap.","templateNodeId":"task.tegelen","templateVersion":1,"ruleId":"gen.task.tegelen","correctedById":"eccf8c7d-551a-457f-aa63-3219ed8f9435","auditEventId":"1e726397-5ae5-4b9f-83e6-bc5dc28df431","createdAt":"2026-07-12T15:57:32.618Z"},{"id":"606ab88b-0e0e-449b-b123-ce25664845b5","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","type":"DUUR_AANGEPAST","entiteitType":"Task","entiteitId":"12cfcf99-a6ad-4899-a105-b4606765f714","oldValue":{"duurWerkdagen":2},"newValue":{"duurWerkdagen":3},"redenCategorie":"PROJECTSPECIFIEK","redenTekst":"Extra dag door betonnen douchebak uit de jaren 70.","templateNodeId":"task.slopen","templateVersion":1,"ruleId":"gen.task.slopen","correctedById":"eccf8c7d-551a-457f-aa63-3219ed8f9435","auditEventId":"670116da-5d88-4fc8-b12e-38e025e0fbbe","createdAt":"2026-07-12T15:57:32.704Z"},{"id":"e9396225-7f5e-4dc4-9e18-543dd70241c3","projectId":"182f8563-312e-4ee3-86e1-27ec4662231f","type":"BESLISDATUM_AANGEPAST","entiteitType":"Decision","entiteitId":"c72cb1a7-1112-46a7-a909-c236d8fa2428","oldValue":{"ankerBeslisdatum":null,"uitersteBeslisdatum":"2026-09-08T00:00:00.000Z"},"newValue":{"ankerBeslisdatum":"2026-08-14"},"redenCategorie":"LEVERANCIERSPROBLEEM","redenTekst":"Leverancier hanteert momenteel 4 weken levertijd i.p.v. 3.","templateNodeId":"dec.sanitair","templateVersion":1,"ruleId":"gen.dec.sanitair","correctedById":"eccf8c7d-551a-457f-aa63-3219ed8f9435","auditEventId":"bfbd97b1-ac7e-4654-ab15-a9f1df007195","createdAt":"2026-07-12T15:57:32.825Z"}],"emailLogs":[]}